Bathroom 1
This project was quiet involved as we needed to a convert a separate toilet and bathroom into one room and move the door to create the space. It also required a full re-plumb as the existing plumbing had issues, along the lath wall being in a bad state after removal of the tiles. Once all the wall tiles, wall and the door way made good, the whole room was boarded out, and skimmed, All pipe work was run under the floor boards to a manifold system to enable easy isolation of all the sanitary units. Once the plumbing was finished all white goods were fitted and the tiling completed, a bespoke shelving unit build with secret removable back panel to enable access to the manifold system.